01
Break it Down
Systematic disassembly with connections, alignment points, and components documented.
Systematic disassembly with connections, alignment points, and components documented.
Coordinate rigging, loading, trucks, protection, and movement to the new location.
Mechanical, electrical, controls, piping, HVAC, and equipment reassembly.
Startup, debug, alignment, verification, and production support.



Industrial equipment is more than a chunk of steel sitting on a floor. Mechanical alignment, utilities, electrical connections, robot positions, controls, process settings, ductwork, piping, and dozens of small details all have to come back together correctly.
A successful relocation is measured by how quickly and reliably the equipment returns to production.
We plan the move, document the system before disassembly, coordinate the physical relocation, and return the equipment to operating condition at its new home.
Pre-move site surveys + planning
Mechanical disassembly
Piping, ductwork + HVAC disconnects
Rigging coordination
Loading + unloading
Mechanical reassembly
Piping, ductwork + utilities
System startup + debug
Equipment documentation + labeling
Electrical + controls disconnects
Robot + automation preparation
Truck planning + transportation coordination
Equipment placement + leveling
Electrical + controls reconnection
Robot setup + programming support
Production restart support